Possible construction of pipe

subway

It appears that the subway proposed

by Mr. Fairley would cost rather less than the pipe line constructed according to his scheme It is probable, however, that it would take considerably longer and this may be a fatal

objection. The actual boring of the subway

would take 18 months but there would have to be

a considerable amount of preliminary work including geological investigation, and it would probably be getting on for 3 years before it was ready for use. The pipe line is expected to be

available in 18 months.

I think, however, the proposal is of

sufficient value to justify our telegraphing

summary to H.K. for the observations of the local

engineers. When we receive the full memorandum on the pipe line proposals which was promised in No.38, the three possibilities now before us can be compared. It is possible that the best

solution might be to construct the less expensive

pipe line immediately and to press on at the same time with the subway. The likelihood would then

be that the pipe line would only be needed for about a year and it might be worth running the

Cyphoon

risk of only one tornado season. I imagine that

sould fater,

the subway can be enlarged so as eventually to become the vehicular tunnel which Sir C.Clementi

wants. It was generally agreed at the Conference on the 19th of September that such a tunnel would

eventually be desirable, and I think in any case,