23

(17).

55. Work. The design and contruction of the Locomotives

and tenders is to be in accordance with the best British

practico and, excopt where modified by this specification,

the work throughout shall comply with the Crown Agents'

Specification No.89 dated June 1914. Contractors must

iill in below the a nos of the axore and the situation

on their works, from whom they plopose to obtain the

following materials. If tncil own akiko is plopovod it

should be so stated.

Materials

Name of Firm

Situation of WolaS

Tylos

Axies

Wheel Centres

Stool Castings

Steel Tubes

Steel Boiler Flates

Other tecl Flates

Springs

Copper Flatcs

Co por Rods

Copper Fipos

NOTE:-

Loading Gauge. A copy of the Railway Loading Gauge

diagram is attached, and care must be taken to ensure

that no part of the cuginos encroachics upon this gauge.

Share This Page