Head 31.-PUBLIC WORKS EXTRAORDINARY

PUBLIC WORKS,

EXTRAORDINARY,-Continued.

Estimate.

1927.

Expenditure Approved Revised

Estimated Estimated up to 31s! December, Expenditure. Expenditure.

1926.

Estimated Expenditure, 1928.

1927.

Head 32. KOWLOON CANTON RAILWAY

Approved Estimate, 1927.

Estimate, 1926.

$

85

$

$

$

$

Foad

Head 32. KOWLOON CANTON RAILWAY

Brought forward

Subheads

1,928,264

Sub-heads :-

sewers

Miscellaneous Drainage Works:-

77 Kowloon Tong Development Area

78 Kowloon Tong Development

Storm Water Drain

Personal Emoluments

264,029

1276,682

120,000

81,310

30,000

24,000

Area i

171,500

61,847 ! 70,000

40,000

14,000 (1)

60,000 (1)

Other Charges

2 Advertising.

MISCELLANEOUS.

E-1-7-2 Advertising

1,000

2,000 (1)

1,000

2,000

79 Surfacing &c. roads Kowloon Tong

Development area

8 Kowloon Tong Development Scheme-

Excavation and filling

81 Filling in large area Kowloon City 82 Refuse Dump at Cheung Sha Wan 83 Filling in areas at Tong Mi and Kow-

loon Tong

3 Bullust.

200,000,

375,401 366,000

60,566 50,000

884,401

50,000

70,000 (1)

E-5-5-4 Bullast

2,250

2,250

+

Ballast (Fanling Branch)

500

500

40,000

35,000

6,000 (1)

E-5-8

Central Mechanical Works

250

750 (2)

62,527 15,000

10,000

20,000 (2)

3,000

3,500

7,500

7,500

7,500

4 Bridgework.

E.3-4 Bridges...

2,000

2,000

201,000

50,000

15,000

50,000

>>

Bridges (Fanling Branch)

200

200

2,200

84 Chinese Cemeteries laying out new

2,200

artás

2,000

2,000

3 Carriages Repairs,

85 Exhumation, Chinese Cemeteries 86 Lai Chi Kok gaol, fire fighting ap-

pliances

5,000

5,000

E-4-3-1 Materials for Repairs and Renewals

17,000

20,000

(8)

33

Painting Contract.....

2,730

5,600

5,600 (1)

3)

Running Repairs (Fanling Branch)

400

2,730 400

20,130

23,130

6 Coal.

WATER WORKS.

E-1-5-3 Coal for Office and Stores

25

25

87 Now main &c., to Kowloon Tong Estate"

PORT WORKS.

90,000

33,982 50,000

40,000

10,000 (1)

E-1-6 Coal for Head Office

250

250

E-3-1-2-1 Coal for Locomotives

135,000

210,000

88 Further Reclamation at Sham Shui Po,

PUBLIC HEALTH & BUILDING ORDINANCE.

783,062

643,662 120,000

20,000

Coal for Locomotives (Fanling Brauch).

5,475

5,475

120,000 (1)

E-3-1-2-3 Louding Coal

1,350

2,000

n

Unloading Ashes

500

750

} (4)

Loading Coal and Unloading Ashes (Fanling

Branch)

80

80

89 Compensation & Resumptions

NEW TERRITORIES

BUILDINGS.

150,000

150,000

75,000

142,680

218,580

7 Compensation.

E-1-14 Compensation

100

100

100

100

8 Conveyance Allowances,

90 Anglo-Chinese School Cheung Chau....

91 Gardeners Quarters at Sheung Shui... 92 Blockhouse on frontier at Lim Ma

45,000 10,000

40,000

5,000

5,000 5,000

40,000 (1)

5,000 (1)

11

Hang

7,500

7,500 (1)

37

22

GERNERAL WORKS.

93 Ronds

5,000

500

E-1-7-6 Conveyance Allowance to Storekeeper..... E-2-8-2 Conveyanco Allowance to Traffic Manager

Conveyance Allowance to Relieving Station Masters) Conveyance Allowance to Disabled Clerk Couveyance Allowance to Traffic Inspectors E-5-1-2 Motor Allowance to Engineer of Way and

Works

90

90

90

90

36

36

144

144

50

20

158

150

(3)

568

560

Drainage :-

94 Training Nullahs

95 Miscellaneous Drainage Works..

96 Miscellaneous

97 Water Works

COMMUNICATIONS.

9 Formation and Line Protection.

1,000

1,000

E-5-2 Earthwork

1,800

1,300

1,000

1.000

J

Fencing

750

750

5,000

5,000

Roads Crossings

1,000

1,000

35

1,000

1,000

Earthwork (Fauling Branch)

500

500

H

*

Special repairs at Mile 93,

1,700

3,550

5,250

98 New Bridge at Tai Po and diversion to

replace the bridge washed away in!

10 Furniture.

E-2-4-2 Fittings and Furnitures

500

500

500

500

1925

51,000

954

99 Path from Ta Ku Ling to Lim Ma

Hang

15,000

20,000 48,000

15,000

2,000 (8)

11 Goods Wagons Repairs.

18,000

2,000 (8)

100 Wireless Telegraphy Tai O Police

Station

17

E-4-4- Materials for Repairs and Renewals.........

Painting Contract

5,500

3,000 (3)

1,625

JJ

Running Repairs (Fauling Branch)

200

1,625 200

101 Replacing wooden by iron telephone

poles on Lau Tau island

7,800

16,500

7.300 (1)

7,325

4,825

16,500 (1)

Carried forward

+45,082

537,277

RESUMPTIONS.

102 Compensation and Resumptions .........

(1) Completes.

Total Public Works Extraordinary...

(3) Retention money, work to be completed in 1927.

10,000,

10,000

5,000

(2) Previous provision insufficient.

(1) Advertising in Chinese newspaper.

(3) Three coaches to be rebuilt.

(4) British Section locomotives running through to Canton.

(5) Considered sufficient.

$2,467,164

(2) Completes amended scheme.