10

and

w

Lave at prosent

3

Замы

かん

shat that

which

25 cost of the Eniging

Calculated.

12: annexed

But it will be

can be

seen from

Whichere of them

bass

Taken

the total

amount

1836

porvised by

Iran dos

hot much

exceed

And

$5 million.

ground for Loping that

the whole contract

reduced as

Bring

IL: charge

Ili total

į given

wik te vo

uude $5 million.

Ikan

Seems

Br

if

15

cry.

The AIM

agreed that

Ich are

Kat Khig

are

Hi net for completing the

asofrome is urgent the point of writing

биб

us

rikat Kuy

an

4ths

Oh

Inhi Thas. Thy

K

Ay of their letter & Trees.

If Hi Thas accept

wik

Ohr

Me

/

suggest

Ikat

be str. at once proceed to make angst. for

£500,000

a

Iran of

In the meantime

wz jLS.

wrik Kitk

as

18 Balann f

with CA

бабаіну

and asking

Sudging

enclosing way of comes

and

len

to consida qustion of maintenance

also aquating them to furnish

details particular of the estimated cost.

We might also with advantage Lave

preliminary talk with C.A.

as

Khi loan phi

our that this may be so relay if Thes. accept our offe

Palluterback

2575-

G.G

25.4.17

B2575

M25/5

Page 10Page 11

Share This Page