that part of the aerodrome site which must be filled

in. Balance of the site includes basin for

typhoon shelter (see enclosure in my separate de spatch of 28th March) and until this is settled the amount

of material required cannot be ascertained. As

regards details of further dredging see Admiralty

Chart No. 1466. Proposed channel approximately 6,500 feet long would be dredged in straight line in

South Easterly direction commencing from point 2,500 feet

south by west of the most westerly hill (231 feet high)

on Stonecutters Island to a point due south of and

distant 6,000 feet from White Point, Stonecutters Island.

South westerly direction in my telegram of 5th March should

read South easterly. Nature of the material to be

dredged expected to be chiefly silt and mud.

Direction of proposed channel is in line with general

flow of the tide and it may be expected to maintain

it self.