COMPARATIVE STATEMENT OF THE ESTIMATED AND ACTUAL

Hends and Sub-Heads.

Brought forwardł

PUBLIC WORKS, -Continned,

EXPENDITURE OF THE COLONY OF HONGKONG FOR THE YEAR 1925,

43

Estimated.

Actual,

Increase.

Decrease.

Provisionally

Voted.

Explanatory Remarks,

$

*

16,643,525 16,329,865.91

1,277,780.20 1,591,439.29

-93

PUBLIC WORKs, ExtraORDINARY,- -Conti,

2,837,500 1,646,787.49

95,336.68

786,049,20

116,300,00

Brought forward........

Hongkong,—Continued.

COMMUNICATIONS.—C'ontinued,

Continued.

Ronds.

(7.) West Bay Development, Road

Construction

25,000.00

25,000

50.00

(1) Wongneichong Development, Road]

Construction

25,000

25,000.00

(2.) Queen's Rosul East,—Widening ta

60 feet

20,000

15,861.04

4,138.96

(.) Kennedy Road,—Impravements

30,000

20,856.17

143.83

(0) Bonham Road, Road Improvements

and Widening

20,000

15,000,00

5,000.00

(p.) Surfacing Main Rouds.......... (9.) Stubbs Rand, surfacing for heavy

traffic

150,000

149,690.72

25,000

17,800.47

360.28

7,100.58

(2) Caine Rond Widening and raising

I

Less work done than anticipated.

Xot beguu.

Do.

Less work done than was anticipated.

The expenditure represents the cost of resuming land at I. L. 6094 for widening purpose.

to new levels between Arbuthnot Road and Aberleen Street (*) Road from Shek O Gap to

D'Aguilar

20,000

20,000.00

Not begun.

30,000

30,000.00

(7.) Access road to War Memorial

Do.

Nursing Home, Stubbs Roml

30,000

44,812.08

14,812.08

(8.) Access road to Q.B.I.L. 14

10,000

10,000.00

15,000.00

(P.) Shaukiwan Rood, Widening near

Taikoo Dork......

20,000

(1) Conduit Road, Wilaning.......

6,000

34,962.52 29,471.15

14,962.52 22.471.15

(2.) Raising Shankiwau Roud between Yee Woo Street and the Electrie Light Works........

15,000.00 22,500.00

Much extra walling was necessitated to prevent washing down into Happy Not begun.

[Valley. [Taikoo Dockyard. Additional work undertaken to improve the bend near eastern entrance to the Heavy amount of underpinning was necessary to buildings and retaining walls.

2:5,000

(9.) Surfacing Wonguelchong Round

East of ILs. 23 10 and 29 1 (*) Service path: from Magazine Gap :

Road to serve new sites south of Turope Maor

10,000

25,000.00

10,000.00

Not begun.

****

Do.

3,000

tre) Hongkong Tramway diversions

and necessary rosul improvement....... (24) Garden Road abore Kennedy

Road, Improvement and Widening.. (re.) Improvement of the junction of Stubbs Road with Morrison Gap Road

25,000

9,994.75

22.922.64

6,994.75

10,000

2,077.30

10,000.00

JIHAL

20,000

20,000,00

(dd) General Works

50,000

119,151.54

69,151.54

125,000.00

Drainage.

7,000.00

6,000.00

Work completed.

Less work done than anticipated.

Not begun.

Do.

Expenditure greater than anticipated due to the development of the Colony.

Training Nollabs:-

(4.) Conduit and Hatton Ronds De-

velopment Scheme

8,000

(8.) Wongneiekong Nulial

50,000

(r.) General Works

30,000

434.28 19,442.94 50,025.24

7,585.72 30,557,06

Practically no development took place.

20,025.24

Miscellaneous Drainaga Works : —

34,400,00

(a) Laying sewer in connection with ›

Confluit and Hatton Ronals De-

velopment Scheme

8,000

912.75

7,087 25

(6) Shaukiwan Road, Laying drain in

connection with North Point

Work commenced late in the year.

Expenditure greater than anticipated due to the development of the Colony.

Practically no development took place.

Foreshore Development

10,000

(e) General Works

40,000

0,371,30 49,782.29

629.70

Carried forward

3,087,500 2,265.178.86

9,782.29

253,486,25

1,025,807,89

13,400.00

354,450.00

Expenditure greater than anticipated due to the development of the Colony.

Carried forward .....

16,648,525 16.329,865.91 1,277,780.20 1,591,489.29