8
Public Works, Extraordinary,—Continued.
Particulars,
- 9
Public Works Extraordinary,—Continued.
Now
Vote.
Estimated Saving
Required. 1924.
Estimated Excess.
Particulars.
$
$
$
Brought forward,
6,673,600
729,000
6,485,550
1,540,950
Voto.
Estimated Saving.
Now Required. 1924.
Estimated
Excess.
$
*
$
Brought formed,
6,341,600
826,000
7,168,900
1,658,800
BUILDING,-Continued.
120 Cheung Chan School,
1,000
1,000
121 Un Long School,
1,000
1,000
122 Public Latrines, Urinals and Bath-
bouses,
15,000
15,000
MISCELLANEOUS.
126 Further Reclamation: at Shamshuipo,
150,000
25,000
125,000
127 Kaulungtong Development Scheine :-
F. M. No. 30..
25,000
(4) Resumption,
60,000
25,000
10,000
COMMUNICATIONS.
123 Ronds-
(a.) Metalling and tur paiuting hilly portion of Lai Chi Kök-Castle Peak and Taipe Roads,
(6) Excavation and filling,
128 Construction of Waterbout Dock at Lai
Chi Kok,.....
100,000
100,000
100,000
20,000
80,000
30,000
129 Refuse Dump,-Cheung Sha Wan, 130 Furniture for Government Offices and
Quarters...
1,000
1,000
3,500
3,500
(b) Taipo Market, kerbing and chan-
nelling, &c..
30,000
151 Chinese Cemeteries,-Laying out now
areas,
5,000
5,000
2,000
2.000
(e.) Taipo Road, Widening and in-
132 Kowloon Bay East Reclamation, forma-
proving from 5th milestone to Shatin,...
1,000
tion of Junk buikling and repairing yards,
50,000
50,000
(2) Widening eleven bridges, (e.) Surfacing and strengthening those portions of main road running through paddy,
10,000
9,000-
10,000
40,000
30,000
133 Opening up of Quarry, Castle Peak, 184 Miscellaneous Works,
5,000
10,000
5,000
15,000
15,000
30,000:
Extension of Roads in Kaulung- tong Developmen! Arca. (9.) Access Road from Tsün-way to the proposed Water Works an Shing Man Valley,
(4.) Waterloo Road extension (300 feet wide) Section between Kowloon Boudary to foot of bills S., of Tunnel (estimate for 50 foot wilth),.. (4) Fanling to Sha-tan-kok Road,
General Works,
DRAINAGE.
124 Training Nullahs:-
(a.) One side wall and invert of unilal
30,000
20,000
20,000
100,000
10,000
90,000
F. M. No. 11,.
135 Compensation and Resumptions,
PUBLIC HEALTH AND BUILDINGS ORDINANCE, 1903.
20,000 20,000
50,000
20,000
WATER WORKS,
.....
5.000 160,000 30,000
60,000
10,000 100,000
5,000
49,350
19,350
136 Extension of Kowloon Catchwater, 137 Shing Mun Valley Sehome....
120,000 100,000
120.000
4.
50,000
50,000
138 Shek Lai Pai, Reservoir and Contingent
Works,
200,000
100,000
139 Fauling Water Works Scheme,
7,000
100,000 7,000
on Eastern side of the Kaulingtong Development Scheme,
50,000
66,000
16,000
(6.) Kanlungtong Development Area, connection of stream North of this area to main tulleb,
50,000
50,000
(e) Shamshuipo, extension of existing
Nanchang Street Nullah to Taipo link.
20,000
20,000
(d) General Works,
3,000
5,000
125 Miscellaneous Drainage Works :-
(4.) Maiu sewer from Fuk Ten Henng in a North-easterly direction to Taipo Road,
25,000
10,000
15,000
(6) Storm water dmins from Nan Chang Street Nallah in the diree- tion of Kanlungtong Village, (c) Kaulungtong Development Schome,
Sewers,.
15,000
15,000
25,000
25,000
(d.) Kaulungtong Development Scheme, portion of Storm Water draios,................ (e) General Works,
50,000
50,000
20,000
53,000
$3,000
Carried forward,
6,341,600
826,000
7,168,900
1,658,300
Total,..
7,270,100 1,021,000
7,952,400
1,703,300
558