Hon. Colonial Secretary,

-

506

Should the foundations of the quay wall at Marine

Lot# 450 à 431, North Point, be constructed in accordance

with är. Duncan's design, there is considerable doubt as to

their permanent stability. Pending expert advies on this

matter, an alternative design of foundations has been

adopted.

2. The green line II shown on Drawing f† - ▲

indicates the location of the quay wall under construction

at Marine Lete 450 ₺ 431, North Point, Betails in regard

to current observations taken during flood and sbb tide in

the vicinity of the works are shown in red and blue colours

respectively.

3. Drawing - B is a plan of the above marine lots

and shows the positions on which bering and pricking were

taken in order to obtain information regarding the nature

of the Harbour Betten.

4

Sections of the bores are show and deseribed on

Drawing - C. The nature of the material penetrated is

similar to that obtained from bores in other portions of 22 the harbour, samples of which were forwarded to the Harbour

Development Consulting Engineers in 1922. The method of

describing these samples has been followed in the descript-

ions en plan. The prickings represent the depths reached

by a norten point 3" x 3" when 5 blows of 100 Row. monkey

dropped 5′ feet caused a penetration of 1 inch. The depths

to which dredging operations have been carried out along

the length of the trench new dredged are alse shown on this

plan. Decomposed granite is found over the entire width of

the bottom of the dredged trenches, with the exception of two short lengths, where boulders are overlying and partially

embedded