86
HONGKONG ESTIMATES
PUBLIC WORKS.
Original Revised Estimate. Estimate.
1924.
Approved Revised Estimated Estimated Expenditure Expenditure
1924.
Estimated Expenditure
1925.
$
$
$
FOR THE YEAR 1925.
179
[Class VI] 87
PUBLIC WORKS.
Origina! Revised Estimate. Estimate.
Revised Approved Estimated Estimated Expenditure Expenditure
1924.
1924.
Estimated Expenditure
1925.
3. PUBLIC WORKS EXTRA-
ORDINARY.—Contd.
Brought forward,
COMMUNICATIONS.
114 Roads :-
(a.) Metalling and tar painting hilly portion of Lai Chi Kök-Castle Peak
and Taipo Roads,
(4) Tuipo Market, kerbing and chau-
nelling, &c.,
(e.) Taipo Road,-Widening and im- !
proving from 5th milestone to Shatin...
(2) Widening eleven bridges, (e) Surfacing and strengthening those portions of main road shuning through paddy,
(f) Extension of Roads in Kowloon
Tong Development Aren,
(9.) Waterloo Road extension (100 feet wide) Section between Kowloon Boundary to foot of hills S.E. of tamel (estimate for 150 foot width),
*
7,200,200
3. PUBLIC WORKS EXTRA-
ORDINARY.-Contd.
Brought forward,
$
*
$
7,840,200
30,000
30,000
30,000
MISCELLANEOUS.
5,000
5,000
5,000
******
30,000
1,000
6,000
10,000
10,000
45.000
10.000
20,000
20,000
117 Kowloon Tong Development Scheme:—
(.) Resumption,
(6.) Excavation and filling,
30,000
50,000
20,000
118 Refuse Dump,-Cheung Sha Wan,
20,000
5,000
45,000
119 Chinese Cemeteries, -Laying out new
120 Opening up of Quarry, Castle Peak,
10,000
18,000
(4) Fauling to Sha-tau-kok Road, (4) Path from Ta Ku Ling to Lin Ma
5,000 160,000
13,000
5,000
121 Filling in large area at Kowloon City,...
60,000
75,000
Hong for patrol purposes,.
15,000
122 Telephone cable between Kowloon,
Taipo & Fanling,
(J) Road to shun Wan,
10,000
10,000
(A) Taipo Market to Kam Sban,..
8,500
5,000
123 Miscellaneous Works,
(4) Widening two bridges at An Tau
and Kum Tsin,
40,000
124 Compensation and Resumptions,
10,000
60,000
10,000
280,000
100,000
120,000
120,000
1,000
1,000
1,000
2,000
2,000
2,000
5,000
10,000
5,000
60,000
20,000
82,000
15,000
15,000
15,000
20,000
65,000
100,000
(m.) Macadamizing Taipo Road between
5th and 9th Mile,
(.) Maendamizing road from Fanting
to Sheung Shui Train Halt,
(o.) General Works,
DRAINAGE.
115 Training Nullabs :-
(a.) One side wall and invert of nullal
on Eastern side of the Kowloon Tong Development. Scheme,........... (b.) Kowloon Tong Development Area,
171
connection of stream North of this area to main nullab, (.) Shamshuipo, extension of existing Nanchang Street Nallah to Taipo Road,
(d.) General Works,
116 Miscellaneous Drainage Works :—
(a.) Maiu sewer from Fuk Tsum Heung
25,000
WATER WORKS.
25,000
30,000
50,000
30,000
125 Extension of Kowloon Catchwater,.
190,000
120,000
60,000
50,000
126 Shek Lai Pui, Reservoir and Contingent
Worn 8,
260,000
200,000
75,000
120,000
127 Shing Mun Valley Scheme :-
70,000
$0,000
50,000
20,000
(u.) Resumptions,
50,000
50,000
5,000
45,000
(b) Access road (Tsun Wan to Pine
Apple Pass),
30,000
(e) Temporary lutako and Conduit,
25,000
20,000
10,000
10,000
5,000
5,000
5,000
(4.) North Conduit,
30,000
(e.) Tunnels and South Conduit,.
400,000
in a North-easterly direction Taipo Road,
to
25,000
25,000
25,000
(b.) Storm
water draius from Nan Chang Street Nullah in the direc- tion of Kowloon Tong Village,..................
15,000
15,000
5,000
10,000
(c.) Kowloon Tong Developmeut
Schome, Sewers,
100,000
25,000
10,000
50,000
(d.) Kowloon Tong Development Scheme,
portion of Storm Water drains.................
200,000
50,000
5,000
75,000
(/) Reception Reservoir,
(9.) Filtering plant and erection,......................
(4) Pipe lino,...
Fi.) Pipers Hill Reservoir,
(.) Harbour Pipe,..........
50,000
100,000
20,000
90,000
10,000
(e) General Works,
20,000
53,000
40,000
128 Kowloou Bywash Reservoir,
10,000
Carried forward..................
$ 7,840,200
129 Fanling Water Works Scheme,
30,000
40,300
7,000
1,000
7,000
Total Public Works, Extraordinary,..
9,187,200