344

運所需一切運費應列入此條

第三節 (用-5-5-3) 鋼軌及配件 凡前節所列 軌道之鋼軌及配件飾新費均列入此並 包括視察費在內

第四節(用-5-5-4)石渣 凡維持第二節所列

各種軌道之鋪石渣費均列入此節

附註 此項維持費應包括總機廠界址內 所鋪之軌道其用費應照每英里所攤百分 之二十五計算並轉入本項第八目附記內 登記作為在總機廠界址內軌道維持之費 用凡計算維持費占資本原價之百分數時 按年報格式第三十表說明總機廠附記所

E-5-5-2-2.Carriage–Under this head should be charg- ed all freight debits incurred on the home line for the carriage of sleepers.

E-5-5-3. Rails and Fastenings–Under this head should be charged the cost of renewing all rails and fasten- ings in the track as detailed above including cost of inspection.

E-5-5-4. Ballast-Under this head should be charged the cost of ballast for maintaining the track as

detailed above.

NOTE Charges for maintenance should include track laid within the boundaries of the Central Mechanical Works. A proportional charge equivalent to 25 per cent of the cost per mile for this head will then be calculated and entered as a footnote under major head "E-5-8” to cover the cost of track maintained within the boundaries of the Central Mechanical Works. In the calcula- tions of percentage of Maintenance Expense upon

[104]

登之軌道費用一項應從軌道項下除去與 其他總機廠費用併在一處

第六月(用-5-6)信號及軌閘 凡關於開車停車 過綫之用具如特別過線枕木及尖义 其配件及各種互顉機信號柱杆燈標線西碼 夫信號機各種警鞭信號軌燈及鎖區畫信 號崗舍等之維持費均列入此目

附註一 凡關於維持信號軌尖軌文之事務 係雇用專班工匠經理者其工資應列入本目 如係由普通路工修理而工費不便劃分清晰 者其工資應歸入本項第五目軌道第一節工 資內

Capital Costs, Statement XXX, Annual Report form, Central Mechanical Works item, the expense for Track carried in the footnote shall be combined with other expense for Central Mechanical Works, and excluded from Track.

E-5-6. Signals and Switches–Under this head should be charged all costs connected with the maintenance of appliances connected with the starting, stopping and crossing of trains such as special crossing sleepers, points and crossings and their fittings, interlocking gear of all kinds, signal posts, arms and lamps, rodding and wiring, semaphores, ground signals of all kinds, switch lamps and locks, scotch blocks and cabins.

NOTE I-Where special workmen or gangs are employed for the maintenance of signals and points and crossings their wages must be allocat- ed to this head, but where the work is done by ordinary permanent way gangs and the cost can not be conveniently divided the wages will be charged to the head "E-5-5-1. Track."

[ 105 ]