7
r
:
A
153
..
Jeluuran Sm
nd
•
the Director of Public Works at the expense of the
Lessees and the cost thereof, estimated at $5,000 must be paid into the Colonial Treasury on demand.
(k) The drainage of any buildings erected on the lot to
be disposed of as may be required by the Director of
Public Works and the Lessees must make all arrange-
ments at their own expense and to the satisfaction
of the Director of Public Works for the disposal of
foul or contaminated water by the construction of
septic tanks or otherwise as that officer may
require.
(1) The Lessees to construct to the satisfaction of the
Director of Public Works such drains or channels as
that officer may consider necessary to intercept and carry off stom-water flowing on to the lot
from the hillsides.
(m) In the event of its becoming necessary or advisable
for consideration of health to carry out mullah- training works in the vicinity of the lot, the Lessees to pay into the Colonial Treasury, on demand, a sum to be decided by Government, towards the cost of such works. Any such works to be carried out by the Director of Public Works.
(n) The Lessees to pay the cost of removing any Chinese graves at present on the area, if such removal becomes necessary, the work to be done by the Tung Wah Hospital Authorities.
(o) The Lessees to pay the sum of $3.00 for each
boundary stone required to define the lot; the stones will be supplied and fixed by the Director
of Public Works.
(p) The Lessees to take up the Crom Lease when called
upon to do so by the Land Officer and to pay him the sum of £30.00 for the same.
(q) The exact boundaries of the lot to be determined
before