order to ship this tank, it must be built in four

seations bolted together with bolts and nuts, and wood

insertion between the flanges.

The top to be a steel plate, and to be fitted

with an iron pips by means of which the tank dan be

kept full of water during the voyage; the bottom of

the tank to have a discharge valve.

A stout tarpaulin is to be spread under the tank,

and its edges turned up over a wooden coping, so that

any lankage is caught in the basin thus formed. An

osoape pipe to the bilge is to be fitted to the

tarpaulin.

The cable to be delivered on board ship and stoms 4

in the tank. All posts incurred in supplying, stowing.

shoring up, and completing the above tank to be included

in the tender.

The Contractor must arrange for final tests of

the amble on board ship in the presence of the

Inspecting Engineers.

in arranging shipment of the cable it must be

stored away from boilers, and so arranged that

access to the sable should be possible immediately

on the ship's arrival,

+