HONG KONG
48411
Part 8 OCT 18
Pumping Plant at Tytam Juk
5. copy report from bonsulting Engineer reeff.. lending bathing our of plout by the four any defects have to to wade good by contractor
Ma Comet
Du Colborg
? Sard copy to you asking him
with ref to last para; of C.E's. report of 12 June (30199) I lost para of C.E1. report of 26 Seft (48411), to
submit a full statement of actual damagep
1
due to the action ofthe Contractor with dates
sustained
grounds for such in detail, if Gort: still desires
to make claim for delay. or to make an
the actual damages,
claims based
suotaimed
fle hout, which are dear traceable to the action ofthe
contractor.
? Strecame the
fort !!!!
1.2.0.
9/10/18.
Take Home legal advice before (tey launch into this Arbitration. A.GA. 11/10/18
Yes Any