Si
میں
ol
Jim who? täpuots
T
märäysaeghe a
447
VT!
ETOSTUDNOS .edi of aring 01 .aby 001 sa baktseda basi sidan stor & Fan S′′ umati ovata
Tot oldathus avaa!? bre! -8837 svode nserted intot pat ban #5 2931 sides bazew 475 matt sidað stoe
TO DEU 15 semakin 15434
istalot svaŊİN
xon-pat dud£**@k} #{6° adat auvent dé!* bet:tl
ATORTAIRE!" paketas} T .es/ac 25 TO? FBAUt bae 70% Ist od raftula so J bożena Jalog de seu .IT.@ meto
tas I. spel ziang rat) 20+HN GIL.8 a*fg 15 0 -J2%!:) adat suunat d‡IW T GMINNYBETH 2 gota Idee $70/1* L* *VIES
gideo pron TIB ATİAN DI PC mett
I
02
(5)
Quantity.
Description.
380 yds
38
3
39
1
mazni tetot T mori MAS
to wa wad „Novosfa vegag
y*merenez le hea salot eat ina tot a leivains aline entse OP swods an nafasium ad of Tede ovo's etra
* Sene · Ting 1
We got those
be onu yo?
A 200de pamant.only an dras k
+
You teto " nort ***
efore airg 02 and 5223 ofer plan 25 smo tær st win 23 ens tr D
T 14
TO".
-of
هم
1
Amount .
Rate.
£.
13
for
18
9.
110 3
Brought forward.
|Dist ribut lon Casa, Post Office pattern, for 30 pairs of 10 lbs. sonductors to 0.P.0. drawing D9196 for position P
on plan B.II. Drawing DS 196.
do.
do.
fitted for
25 patra for position 2 on plan.
30 ft. Tubular Iron Telegraph Poles
No.109 type complete se item
20 for positions L, M, V end
0 on plan,a. £nawing 30951.
Section C.
100 pairs 10 lbe. conductors
dry core cable, lead sheathed and armoured to specification D.
Cast Iron Straight Through Joint Boxes for above 100 paire cable, complete with lead sleeves, and all necessary joint ing materials as other joint
boxes above. Arawing
44
Hem 19.
Lead sleeve branching joint for position R on plan to take 100 pairs cable in, 1.50 paire cable through, and 2.35 pairs brenching cables. Complete with subsidiary lead sleeves, paper sleeves, and all necessary joint ing
material.
The
akewor
the
sack from inslecting boice does not cover the
drsyring. 30138 8. If this is required the price will be Section
£7. 7: 6. extra)
150 pairs 10 lbs. conductors
dry core cabla, lend sheathed and armoured to specification D.
60%
12
=
ea
for
97
lo
11/8/6 20.
3106.
for
326
480 yds.
100 yds 35 paira
10 Iring
4.3
3
120
10
do.
do.
41
77
b
Cast Iron Straight Through
Joint Boxes for above 150 pairs cable, complete as above joint boxeB. Drawing as tem 19.
27
=
Ras.
t:ཀ
"TA
13
1
Lead sleeve branching joint
For
326.
13 10733 ***SITE ani de
-VOJA
SMA20 serad
.brawtol bedane”
box for position T on plan to take 150 pairs oable in. 1.50 paire cable through. 1.100 pairs cable in one branch and 1.35 pairs cable in opposita branch. Complete as item 39, to come drawing.
Carried forward.