66

branches of the lead sleeve branching joint at this

point until they are required.

(n). The manhole frames and oovere under items

79 and 80 are for the protection of the lead sleeve

branching joints at R and T. provided the cast iron

protecting box shown in drawing No.30138A is not

preferred. Prices are given in our list for both

pavement and roadway frames and covers in oase either

or both may be required.

(o). The lengths of cable and quantities of

jointing boxes &c. in our list are only given as a

guide to the cost. The actual lengths and quantities

to be ordered should be determined on the spot.

9. Regarding sections D. J. H. and G. on plan

E.II., we observe that to reach the point marked the

route via the Government Offices and Albert Road is

followed. Te suggest for consideration whether it would

not meet requirementa, and be more economical, if a 50

pairs oable ware laid from the Post Office via Pedders

Street and D'Aguilar Street to a point near the Central

Police Station. From here to I a 25 pairs oable would

perhaps be sufficient.

In this case Section H would be

dono away with and sections D and J modified to a 100

pairs, and a 25 paire cable respectively. At point T

the 100 paire cable would be divided into a 50 pairs

cable to section E, a 35 paira cable to point U and a

25 paira cable to point Z.

10. To provide the single connection at "Motor"

on section G we suggest that it would be preferable to

run

0.