22

Ilana Ton,thesetq maudid and to godt rom besilijalor -ero nult nael ed griðned dous testo .0 "¿S de noitsijanaq ent *moidotseneg fenigito and to Hau-

nodwoo swq yilaskmedio ut #idulos ed Ifods witledque eft,(b)

Janel do to dnetxe end of awtoroquet ris da abinqfunid

.RE.ee

aiduloa ed Ilala newadid Lejot end to 2.20 menit saai Joli .(8) .@TUJ TəqUM3 Tis de skitoldbezret nodzeo eruq yll:oimado ni

nevadid Lojot ads to REV mult nael ton kie nant szan Joki,(1)

ris te adtdqan nå12axaq ewund Müü ni eiduios ed IInda

.swtorequat

.:odzao seri morì seert ed Ifada mutlodque eft .(a) niltaraq to xU81.0 msis orem nistros ton ILadis rust Intiqas sT .(d)

.elaos

·

.i

vietningen betaedi ad Ilaria etnjot.go Iniorb, and ina mantindqua edT

.0 °avi of ©oal (mit to artaraqet s of seomniiçge sidstiva ni wild dibe bexlu yliiguoroda bas of bebba ed IIndia Tolli? bl∞ɔ ɑdT .3

•OJager_98_Istenka

gniri: edt be exutri. sdt os babbs ed Ilmue mutLadges Jod ent yreve liju beitioeqe ati il axemagne mit nidtkw beunitnog od IInde dtiw bedroo ylisworont ed [Lads etager je Isteniu end to sloitraq

west Langua yd 1⁄2 of à mort ad fiana ewtrim and ni mutlarigan to trvalo ent

Lewdxim ads to Jd iew Latot edit to tɖiew

+

10 BJIRO eśund in® Kİ 1tor auð að heitmo ed (lade ewtrim adT end aamuser ji mim .0 o¿si mont zabico sa ton flasis bns unogow riw berevoo ed Llave unq;ow sat.beilage ed of si ti doiuw of Jeezja ant ni treci adé mister yiragong of Iniraten aldetive Touto to anyneD

C

Jodi zidiw suɔd and revo yártoti baerqe ad Llade ewtxim saT .a -bid bersimit quit land redmora VOS to dtqsk a od neder bas alevada „beiîioaqa postwe zaizser to saec.

hellon Jou 8 adiw betonques platsiha...i od Lana exdriu eft

ة.

Dozėt to sitbiw tool raq ebrwog 300 Jasel tægnini jew

7.

56

This shall be immediately followed by compacting with a steam roller weighing from 175 to 200 pounds per inch width of tire. The steam rolling shall be done by first rolling across the roadway at right angles to its direction, then crossing diagonally first from one side and then from the other, the direction of the two diagonal roll- -ings being approximately at right angles to each other, and finally by rolling parallel with the direction of the road.

The rolling with the steam roller shall be continued for at least

5 hours for every 1,000 square yards of surface.

8.

Such portions of the wearing surface as it may be impossible to roll shall be thoroughly rammed with hot tampers smoothed with hot smoothing irons, care being taken to not burn the surface.

9. The finished surface shall be smooth and conform to the prescribed finished surface of the roadway. When a straight edge ten feet long

is laid on then finished surface, parallel to the line of the street, the surface shall in no place vary more than " from the same. Through- -out the work a template shall be used to secure the proper camber. 10. As soon after the completion of the wearing course as is practic- -able, a seal coat of the same asphaltic material at a temperature of from 150°C. to 175°C. shall be spread evenly over the surface with hand

distributorn at a rate of not less than 0.5 gallons per square yard.

11. It shall then be covered, while still hot, with dry stone chips,

sand, or clean pea gravel sufficient to take up the excess asphaltum, and again thoroughly rolled with a light steam roller (6 - 10 ton). 12. No asphalt surface shall be laid in rainy weather or when the

foundation is wet.

NOTE. Gravel may be substituted for crushed stone if necessary.

Crushed stone is preferable on account of its keying properties.

For the construction of an ASPHALTIC CONCRETE SURFACE 2

INCHES THICK, the stone shall be graded as follows:-