Pora. (57

Para. (B) (a).

Mr Peter has been

to myself

34

bitterly

bostih

that I am wrath of credit his

statement that ho auffressed matter which

should have been placed before the Committees

the

did es

fremmety

maths

such

dealt with in his letter

under consideration.

The Contract

کی رو سے سالار

foundations

only let in Nov. 1902. It was not

completed until

January, 1906.

The foundation

not entirely,

come butted

were othe

Angely

under the supervision,

Mr. Gale, Excentur Enginen,

alterations considered

o all

necessary

to rende

arre

made

during

the basement watertight

the frogen ofthe word. At Fisher

+

imply

that a sum

7 19.428.77

was coasted in remedying depetir

construction but that was not the

Chal

It was merely the cost certain work which cow required rinder the basement watertight

Share This Page