Para. (57)

Para. (B) (a).

Mr Peter has been bitterly bosting to myself that I am not crediting his statement that he addressed a matter which should have been placed before the Committees under consideration. The Contract foundations were only let in Nov. 1902. It was not completed until January, 1906.

The foundation work was not entirely completed when alterations considered necessary to render the basement watertight were made under the supervision of Mr. Gale, Executive Engineer. It is implied that a sum of $719,428.77 was wasted in remedying defects in construction, but that was not the case. It was merely the cost of certain work which was required to render the basement watertight.

Edit History

2026-06-25 21:00:35 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Para. (57)Para. (B) (a).Mr Peter has been bitterly bosting to myself that I am not crediting his statement that he addressed a matter which should have been placed before the Committees under consideration. The Contract foundations were only let in Nov. 1902. It was not completed until January, 1906.The foundation work was not entirely completed when alterations considered necessary to render the basement watertight were made under the supervision of Mr. Gale, Executive Engineer. It is implied that a sum of $719,428.77 was wasted in remedying defects in construction, but that was not the case. It was merely the cost of certain work which was required to render the basement watertight.
Baseline (Original)
Pora. (57Para. (B) (a).Mr Peter has been to myself34bitterlybostih that I am wrath of credit his statement that ho auffressed matter which should have been placed before the Committeesthedid esfremmetymathssuchdealt with in his letter under consideration. The Contractکی رو سے سالار foundations only let in Nov. 1902. It was not completed until January, 1906.The foundation not entirely,come buttedwere otheAngelyunder the supervision,Mr. Gale, Excentur Enginen, alterations consideredo all necessary to rendearremadeduring the basement watertight the frogen ofthe word. At Fisher+imply that a sum 7 19.428.77 was coasted in remedying depetirconstruction but that was not the Chal It was merely the cost certain work which cow required rinder the basement watertight
2026-06-25 21:00:35 · Baseline
View content

Pora. (57

Para. (B) (a).

Mr Peter has been

to myself

34

bitterly

bostih

that I am wrath of credit his

statement that ho auffressed matter which

should have been placed before the Committees

the

did es

fremmety

maths

such

dealt with in his letter

under consideration.

The Contract

کی رو سے سالار

foundations

only let in Nov. 1902. It was not

completed until

January, 1906.

The foundation

not entirely,

come butted

were othe

Angely

under the supervision,

Mr. Gale, Excentur Enginen,

alterations considered

o all

necessary

to rende

arre

made

during

the basement watertight

the frogen ofthe word. At Fisher

+

imply

that a sum

7 19.428.77

was coasted in remedying depetir

construction but that was not the

Chal

It was merely the cost certain work which cow required rinder the basement watertight