Pora. (57
Para. (B) (a).
Mr Peter has been
to myself
34
bitterly
bostih
that I am wrath of credit his
statement that ho auffressed matter which
should have been placed before the Committees
the
did es
fremmety
maths
such
dealt with in his letter
under consideration.
The Contract
کی رو سے سالار
foundations
only let in Nov. 1902. It was not
completed until
January, 1906.
The foundation
not entirely,
come butted
were othe
Angely
under the supervision,
Mr. Gale, Excentur Enginen,
alterations considered
o all
necessary
to rende
arre
made
during
the basement watertight
the frogen ofthe word. At Fisher
+
imply
that a sum
7 19.428.77
was coasted in remedying depetir
construction but that was not the
Chal
It was merely the cost certain work which cow required rinder the basement watertight