61

„čnomi oʻi od seruait bovino 70% bexan eɔİru exİXE

aesia Lanun end to Jrwosos no abrau ai milo en?

.beriuper aerode eind to Laijiro ond ni neand anw drow Bid not adinary ent

¿ guibanaye Jon Benoja ni as asiticnong to Ilia

beriuper noiduvere ni sow di ocetenv done aduo deel

.5.1 el mort griywi Benose ezrel yrov mi eu of

.0.1 Se of

.Jrwooom Ignit at ni tot bewolle need jo. cum sit

si edro Jeet ti glibeeore cenoja ni ¿ðiðnaup er.

.So.duer ni fob w to eulov outro ent .0.1 dłu

.SO.COUR..

TOJQWIJNG) od aub JrILJONĀ,

.owej? J cowgit Ile tot beder sodryI SWI od.cz nowyit edt „irit"bus nivano To? ni HiPIS ENT

to [[id fani ̧jiro edt ni betquia bolidem erT .Juemibe¶

Jqeure) dro" bovino arid zniwenom 101 soit isnowy

to insup eút evi, od (u),cow (eoiteul to eutade

od (ú) ment; bexit bna heikqqwa ua edinma erit

-ni (a) zw8 •gnivius and rot,noitišbo ni ebivorq am ban grillaw edinary rot Indod and ni bebuls-

etoforent Todovitnol erT .ylajnteqes nevig Jon

.aekoja Llama ni juillaw not adet end da ti booing

.Jiwosun İmnit eurot be che uw horlten emune ent

eziri and to aulav „Wre edt,yiqque end gri karyen

.V modI ni bewol in need apri zeroja

eilt ni bobuloni yhueri; ei einî guixi? add onihagen

ne død ¡evodo benirIgre sa grillow eJimg to Isco

ni ei ediner; and na bewolls ed blone oder wïTƏ

•ymnudede ni nas nenoda syını yıov

00.008..

00.00%.

-

{

gnittọa s gniteion not

JTË

Jon)drow be vwo ni ọdimt} (sutnja gribeIoni

·TOJOBWNOŬ uð anⱭ

@'ToJoBiJnot ni nevig .5.1 VED, I to yƒijroup odr -:ejol

ot senojo diote huwe Ilov ni etimï, nisfy aebufoni mielo

.aldinaiba ai eive on to inw

gnirolloi and truosor Lanit and nl .gmivizo ent nilimas“

.F

.8

9.

10.

amounts have been allowed. These are considered reason-

-able.

-

Statue of Justice for granite, fixing & carving...709.50

Deduct granite & fixing 129 f.c.

say 2.50..

.322.50

Statue of Justice

Figures in Pediment

Wreaths

-

Carving only.

..387.00

..1,500.00

20.00

----

Total for carving........1,907.00

No extra is due to Contractor.

Pointing in Cement to all granite.

The Specification and the Bill of Quantities provided for the granite to be bedded and joined in lime mortar

and to be pointed in lime.

In execution, the granite was bedded in cement with

an edging-about 1" wide-of lime putty; and on completion the joints were raked out and pointed in

cement.

This method involved extra labour in setting the granite and the extra cost of cement over lime

for the pointing.

The quantity amounts to 117,000 feel super; for which the Contractors' claim is fair and reasonable.

Amount due to Contractor.

Full size model in brickwork.

..8700.00

About three quarters of the total length of the Pediment to West Elevation was built up temporari- -ly in brickwork and rendered in lime mortar. No price was agreed upon at the time, nor were

measurements taken.

Nothing has been tas allowed for this in the

final account.

The Value of work ascertained from measure- -ments of the granite pediment is $450.