Extra price asked for carved figures to Pediment.
The claim is made on account of the unusual sizes
of the stones required.
O moly 28.18
Ο
·TOJOWISHOŬ of and
ni etim:70 8.18
1.220
8.500
.emoll to sɔ in100
Irdot bedoe770)
bewol La JNJOMÁ
The granite for this work was taken in the original Bill of Quantities as in stones not exceeding 5 feet cube each whereas it was in execution required
to be in very large stones ranging from 19 f.c.
to 92 f.c.
-*109 benivom
-Tio Boin-
NO IBÍNO-
W paly DE.EX
·TOJURIJNOJ of and
8.
ன்
.Beloumih to 8001
.1 ejimæ 0.001
nic.oli
0.0IS
0.8II
Latod beton TOD
bewolin JrWOMÁ
Belonif
03.X 0
06.OVER...........
• • • • "IOJ OKT ̃ínov od But
&
mquulet niví mi nouote osienovo not bodan esine
ent to etrug Teiwo tot oa la bis,amuloɔ szedt tot zenoja ent
orew mo,id esie regtei noul to ed of bertiuper Brew „Jmihlivú
.seiðijnsup to Ilid Isnizito suit mi tot bobivorq
.Jnwoods Ísnit erk mi ebam need sen soruwolle oll
em penløv biro in beno, a esiezero to asijijimup ent
-;10bow By
30.28Y‚S • aulav BWT2 .0.1 Ɛdí ̧II #tati brus armulo) minti
06.dia
RES
ST. Yer
09. Pad
#
EAC
d&a
dnoti „W evATJINOTA
Twoc duenƉ ni erei¶
• 080
¿E. IVS
ET.UTS.Þ
ET.JYS A
"TOJOBIJNOU od eph JrIKJOLA
ae Ivarmiq
.ð
This has not been allowed for in the final account.
The quantity in stones exceeding 18 fest cube is
895 f.c. the extra value of which is 8985.52.
Amount due to Contractor....
KZZJ
.8985.52.
Extra rated asked for all figures & Statue. The claim is for carving and firing the figures &c. to
Pediment. The method adopted in the original Bill of
Quantities for measuring the carved work (except
statue of Justice) was, (a) to give the quantity of the granite as supplied and fixed; then (b) to provide in addition, for the carving. But (a) in-
-cluded in the total for granite walling and was not given separately. The Contractor therefore priced it at the rate for walling in small stones.
The same method was adopted for the final account. Regarding the supply. The extra value of the large
stones has been allowed in Item 7.
Regarding the fixing. This is already included in the total of granite walling as explained above; but an extra rate should be allowed as the granite is in
very large stones and in statuary.
Extra for hoisting & setting granite in carved work (not Including statue)
}
850 f.c.
.850.00
Due to Contractor.
.850.00
Note:- The quantity of 1,637 f.c. given in Contractor's claim includes plain granite in wall and arch stones for
which no extra is admissible.
Regarding the carving. In the final account the following