(3)*

(4).

44

-rug ile Toʻt Tafaw to notiqmusnoo add bna 000, TAS no eaolo

of atruoza vlcque trataroo yabwub (ebayt yutbulout) aaaog

bretxe your coasee yib A .yab noq amolisy wiiiim à Juods

berkupar 933rota lamiðibbo add brus ayah 035 to solveg s tero

-:swollo1 as exotererit a? 1108908 8 dɔUR TOVO abij ot

.8.101120

Jnsdɛnoo ntaðniau of betiuper vð Einaug 000,000,088,1 .{ayab 085) mosson yıb gutwb yiqqua

-: Joubed

(nao da operoje JnOBOTI

(da uoqu bebrsqəb ed Vib to drÉMU SOLID VIMO D

000,000,032

C00,000 for 000, 300, FES

000,000,#2

{

zntzb emberja to bie IY

ñonesa VIL

Don Lupon eyotoja IagolJEDDA

TłoVIDASI wen add to yitosqso aút mt aueoxe erit .ð

,10,amollen 000,000, fod of atruoc adreneituper tneaeng Tevo

snoflag 000,00г.? VIIỰi (ayat oks to botreq « revo baerqa derv

Ja es rotiqwwadoo to ajar wins adj grtawans doliw (yab req

.007.53 20 mottaiuqoq isdtwi e rot abivorq IItw (Jmea8rq

noitelugog odd bewodu totiiw,doer to evenes ent znibisgerald

, roer at as oman eft ylisoltosrq ed of retaw ritka botiqqva

yleasпbenoitnem-jani teey erit rot avaneo edð zxitqeoos bris

ent Tot noidalıyoq eds ni sasʊroni edð Sædt balt e# .003,208

to ejot emne erit JA .004,rá ot betruroms irer untxe ebaoeb

barney OS yllut tot ootttwa [Itw ogaroja aufqwa edit oaseront

t

Bre betqeoos ed (004,800) 30er to avanso erit,revewod‚ÎI

Viðmes ↑rer öne doer reseted as eeseront ko ajer omoa adj

Boltiva timo Iitw ezstoja auiqiua ort,bertatnim od ,008,E£

.BTAGỵ of Juoda 101

to zooque at bestuper od trowugus venituut vas I .[

ai doldwaroling notIlm 002,† 10 egeroja Isnoliibbc erið

erid to troqen tпeser edt ni brwol ed like Ji,bebtvorg guted

at caso znoïda a foldy mi (ensitTask.rd) jalgofotrejoaa

elderstienoo a rot rajow to egszoje odd to quovat at duo ebcm

.moijqmr:noo zot mottudintsib aðf exoted botreg

!

5.

Finally, I do not regard Site No. 1 as being aban-

doned by the adoption of the Scheme now submitted as it will

be possible, by constructing an extensive system of catch-

waters, to intercept the drainage from large areas outside

the natural Catchment area, which is delineated upon the

enclosed plan, and so ensure the filling of the additional

large reservoir which would result from the construction of

a dam on the site mentioned. As however Site No. 1 is within

the tidal area of Tytam Bay and as the construction of a dam

on it will involve the excavation of a trench 60 feet in

depth below low water level in order to reach a rock founda-

tion, it does not lend itself to the construction of a reservoir

of greater capacity than that proposed in February 1905,

namely, 1,200 million gallons. Recent developments indicate

that further reservoir accommodation will be required in

future and it is therefore important that the additional

storage capacity to be gained by the construction of a dam

on site No. 3 should be availed of. Further, the early

augmentation of the supply of water is of the greatest im-

portance at the present time and this will be effected much

sooner by the works now under construction than by works on

Site No. 1. I may add that, by the execution of the present

scheme, involving an addition of a storage of 1,500 million

gallons, the City and Hill District will, for the first time

since the Colony was founded, be in possession of a really

adequate supply of water.

Whatham.

Director of Public Works.

26. 6. 13.