Enclosure 3.
C O
10881
OWLOON CANTON RAILWAY.
(British Section)
ESTRATED
AMOUNT REQUIRED TO COMPLETE THE
II
Head
Sub - Head.
PRELIMINARY Survey EXPENDITURE
Amount Required
CENSTRUCTION IN
EQUIPMENT OF THE RAILWAY
Explanatory Notes.
323
LAND
Lend
FORMATION
(a) Earthwork
(b) Tunnels
(o) Roads
7,912.81
6,654.65
This smount will be required to complete Earthwork.
For reinstating P.W.D. Drains, Sewers and main and Road surfacing when building Kowloon Station.
BRIDGES
(e) Mejor
(b) Minor
(c) Culverta
FENCING
(a) signs
Boundaries
::
TELEGRAPH
Telograph
TRACK
(a) Ballast
(b) permanent way
STATIONS & BUILDINGS
4,000.00 This amount includes cable through Beacon Hill Turmel & also all equipment & instrument for new station.
10,953.25 For Kowloon Station Yard. 131,074.92
For Kowloon Station Yard includes rails, sleepers, points & Crossings, etc.
Kowloon Station & Offices Including Carriage shed & Engine Shelter, installation of light and water, (a) Buildgs: Fixtures 248,127.67
Goods Transit Shed, Awnings and Raised Platform. (b) station machinery 16,981.08 Kowloon Station, Signalling, water, Fire Appliance, weighbridges, Weighing Lachine,Buffer stops, Etc.
8,000.00 | Kowloon Station, includes Lavatories, Buffet, and kitchen Arrangements, and Office Furniture. 15,000.00 For addition to Engine Shops on account of increase in number of Locomotives.
(e) Furniture
(a) Workshops
PLANT
(a) Construction
(b) Loco, Tool & Plant
(a) 0. & W.Tools & Plant (a) Engineering
GENERAL CHARGES
9,975.00
,000.29
(s) Loco Rolling Stock
140,0
(f) 0.&W. Rolling Stock 125,512.07
(a)(1) Salaries & Allow: 12,477.62 (2) Quarters & Office 53,500.00 (5) Instrumenta
(4) Office Expense
(5) Medical
(6) Home Charges
(7) Interest
(8) Exchange
(b) Accounts
Andrassalid credit
by
Stris Sales
1,002.15
$691,171.48
ميس 5
This is for four Locos, one sanctioned in Final Batimets, the second provided for in special expenditure 1912 Estimate, the third sanctioned in 0.5.0.1, 041/12 and also for an additional Engine for Fanling. Branch Line, sanctioned but order not yet placed, it includes also all inspection and Crown Agents' freight, landing charges and all cost of erection.
This includes total cost of eight coaches now in course of erection, slao rolling stock for Fanling Branch Line not yet ordered.
Kowloon Station, Architect!e Fees, Olerks of the Works and Timekeepers. For Manager's House and quarters for the Station Staff at Kowloon.
fees
641/17/:00