OSE

.(A)

tewaoin

.CO\AMPI .3

121

400ft aʻqsteronë fatmofob

.0021 、ous deos,goodṛnol!

JIN* T .D? Tottol quog at onnonoton di

amotni od hodoorih ma I dasi visunat „No” and to 9201 gaol

nad Jabot noolwoN Je tofza'i orit not točositno) odt taut voy

inupons no a88,48 vot miało a chorumevor alde delw bonbol

-no ods to 1891778-noa oid xd bonugo drow aid of yalab ont to

.basiyaff n017 X10W-

Fixxx

5.2.10.

$3.3.10.

Horsehay Co. dated 20.12.09 stating "we are

(aumble to name date for delivery of first

shipment owing to the fact of not having received the 9" x 7" steel joista from the

rolling mill,”.

Letter dated 7.1.10 received from Crown

Agents (in reply to lettor of 18th. November

again explaining delay.

Advice dated 28.1.10 received from Crown

Todet" M od mama a at natwolfot of”

.$

-:boTTUNGO aad Jeth to "aomtoqeft adxo" oldu¤ ons to

.etmant qwo"b of babuamzot *zabal

.00.8.81

voda gattsexpat stena mwonḥ of diee mansa Cet

nood natveri solväs on caabri otiboqxo of

.20.££.[

M

.etah tart of qu modt mort bavienot

AWOTO Mort boviosort 20.01.8 botab tozzof

bengiq good bad Tobro ta galiste admoDA

vrovićáb not hotmoq* .00 yadoozok of? d÷÷v

."aysb 08 basfani mb

.00.II.SI

15.3.10.

antiiltos adao¬A пworð að duen tortod

drov tais anteroqot hits 90.1I.I to mathežoj

ode to #naw rot boqqota vilanteɔSTE DAW

.00.[1.81

dromori

mwon? mort baylasar 20.£5.31 batsh rotted

to vetgoo gniaofono bas oldao or anoni

a19**ostua3“ 2011 20.0.3 batsh areštol

botah Tosaign¤ qntė Ivano? est mort has

**akob natatalqen 0),II.01

00.S1.ES

avoza mort bovlooo" 90.SI.33 batab tattoT

nood bad tuomqtila Jadð qatatyba ataogå

`mort roctol to goo gatuolɔmo bus boyafob

VOI.I.AS

tarisato?!

(aožnolob orit not atmoŋA avoro ed

.obro.I

8.4.10.

Agents stating that 84 pieces of steel-

-work had been shipped on the S. S. *Glon-

-strate". Advice dated 18.2.10 received from

Crown Agents stating that 112 piecos had been

shipped on the S. S. "Glenroy".

Letter dated 25.2.10 received from crown

Agents enclosing drawinggand particulars

for erection purposCE.

First consignment of ironwork received ex

8. S. *Glenstrate".

Balance of ironwork roccived ex S. 5. *Glen-

-rcy".

Work on the Building practically ceased

at the end of October, 1909, and was not resumed until the 15th.

March, 1910, on which date the ground and first floor stanchi ons

as well as first floor joists were delivered on the site.

In these circumstances the Director of

Public Works was of opinion that it would only be fair to

allow the Contractor some compensation for this delay of 4Ť KAM

months and he has been authorized to inform him that his claim

will be considered on the completion of the contract.

3.

4.

I would point out that the 9" x 7" steel

Joists were for the first floor stenchions, 10" x 8* joita being

used for the ground floor stanchions. Had these latter boon

forwarded together with the framing for the first floor at an

earlier date, the work would not have been delayed to such an

extent. I am to add that His Excellency the Officer Administer-

-ing