5.2.10.
$3.3.10.
Horsehay Co. dated 20.12.09 stating "we are
(aumble to name date for delivery of first
shipment owing to the fact of not having received the 9" x 7" steel joista from the
rolling mill,”.
Letter dated 7.1.10 received from Crown
Agents (in reply to lettor of 18th. November
again explaining delay.
Advice dated 28.1.10 received from Crown
Todet" M od mama a at natwolfot of”
.$
-:boTTUNGO aad Jeth to "aomtoqeft adxo" oldu¤ ons to
.etmant qwo"b of babuamzot *zabal
.00.8.81
voda gattsexpat stena mwonḥ of diee mansa Cet
nood natveri solväs on caabri otiboqxo of
.20.££.[
M
.etah tart of qu modt mort bavienot
AWOTO Mort boviosort 20.01.8 botab tozzof
bengiq good bad Tobro ta galiste admoDA
vrovićáb not hotmoq* .00 yadoozok of? d÷÷v
."aysb 08 basfani mb
.00.II.SI
15.3.10.
antiiltos adao¬A пworð að duen tortod
drov tais anteroqot hits 90.1I.I to mathežoj
ode to #naw rot boqqota vilanteɔSTE DAW
.00.[1.81
dromori
mwon? mort baylasar 20.£5.31 batsh rotted
to vetgoo gniaofono bas oldao or anoni
a19**ostua3“ 2011 20.0.3 batsh areštol
botah Tosaign¤ qntė Ivano? est mort has
**akob natatalqen 0),II.01
00.S1.ES
avoza mort bovlooo" 90.SI.33 batab tattoT
nood bad tuomqtila Jadð qatatyba ataogå
`mort roctol to goo gatuolɔmo bus boyafob
VOI.I.AS
tarisato?!
(aožnolob orit not atmoŋA avoro ed
.obro.I
8.4.10.
Agents stating that 84 pieces of steel-
-work had been shipped on the S. S. *Glon-
-strate". Advice dated 18.2.10 received from
Crown Agents stating that 112 piecos had been
shipped on the S. S. "Glenroy".
Letter dated 25.2.10 received from crown
Agents enclosing drawinggand particulars
for erection purposCE.
First consignment of ironwork received ex
8. S. *Glenstrate".
Balance of ironwork roccived ex S. 5. *Glen-
-rcy".
Work on the Building practically ceased
at the end of October, 1909, and was not resumed until the 15th.
March, 1910, on which date the ground and first floor stanchi ons
as well as first floor joists were delivered on the site.
In these circumstances the Director of
Public Works was of opinion that it would only be fair to
allow the Contractor some compensation for this delay of 4Ť KAM
months and he has been authorized to inform him that his claim
will be considered on the completion of the contract.
3.
4.
I would point out that the 9" x 7" steel
Joists were for the first floor stenchions, 10" x 8* joita being
used for the ground floor stanchions. Had these latter boon
forwarded together with the framing for the first floor at an
earlier date, the work would not have been delayed to such an
extent. I am to add that His Excellency the Officer Administer-
-ing