1J

I

I

203

of the tunnel but only three rings instead of five in the

hard rock.

I enclose summary of expenditure for the month of

February 1909.

Your truly

Sd) G.W.Eves

Chief Resident Engineer

Enclosures

(Drawing C.R.F.No.708

#

W

General plan of passenger arrange-

716 -

#

#

#

11

717

#

"

ments

of buildings with

timber roof

of buildings with iron

roof

606) Tanks & staging suggested for indent 607) No. 43 item 1.

(Summary of expenditure for February 1909

Under separate

"

cover

-27-

Wa

Share This Page