+

OK BISA US

a

12.

193

from station to station.

30.

I see no difficulty in making these signals

out here supervised by the same assistant engineer who

would be appointed to look after the erection of rolling stock and workshops.

31. The local conditions especially those entering Kowloon Station Yard through the big cutting need

studying on the spot in order to get the best position, heights etc for the signals.

32. A more detailed account can be given as the work proceeds if you sanction the system and my making the signals locally.

Yours etc

(sd) G.W. Rves

Chief Resident Engineer

.1.

Banclosure by separate Packet

10 drawings of rolling stock

C.R.E. No. 689 to No. 698 inclusive.

1 Specification for above

1 drawing of workshop C.R.E. No. 686

1 Description of same

1 List of Tools for above

1 Sketch for Plate floor &

handrailing

C.R.B. No. 687

Enclosures to

this letter

I'm

Share This Page