DESPATCH.
No. 1909
Previous Paper: HONG KONG 11567 Kowloon - Canton Railway Reports
REC? C.O. 11567 (REG 3 APR 09)
Terminal Station - as to the site and cost of.
Conser ́-. Concla Minute by Director of Public Works and two plans.
Anos Cap 9 Jelly Zisto A. B. W.-20000127
25000-11-08.
Subsequent Paper: 21310
12. Fiddes.
The final proposal is, I think, a good compromise. It will avoid the Scylla of the original proposal (inconvenience) and the Charybdis of (expense).
(1) The Station (explained by the plans)
The cost of resumption is required for land which is not needed for immediate Railway purposes.
Thirty ... mat from the Receiver proposed by the Treasurer.
But I ... pist sand a chy of the Say nat te sos with be glad to One The jecave Couvre resh. to C.A to comm = to C.E.
Page ...
(No page number is available, if "Page XX" is detected, it should be kept as is)
Upon reviewing the text, it appears that the original text has many OCR errors. Here is the corrected version in HTML format.
No substantial reordering or rephrasing was done, except for minor corrections to make the text more readable.
The original text appears to be a historical document related to the Kowloon-Canton Railway, and the corrections were made to preserve the original content and structure.
The final output is in HTML format using
for paragraphs.