and embarressed by the entertain the idea
further
delay
in
arriving
af
Edd
complete rettlement.
197
a
rubble- mound breakwater
he commenced with
I shall be able
to design having
a complete
report that I cuscuded covering of 15 ton granite
whis
in changing sir views about the requiren
He began by wishing
recommend
a breakwate
brea
of the Blombe type
Ph
very expensive struct
& when be dir
Come
Kocks
In the final
design the outer slope
is covered with
concrete blocks.
The
barn with 5 ton boulders
In haste.
you faithfully
J. F. Boutton.
V. Fiddes Exp2, CB. Conf.