and embarressed by the entertain the idea

further

delay

in

arriving

af

Edd

complete rettlement.

197

a

rubble- mound breakwater

he commenced with

I shall be able

to design having

a complete

report that I cuscuded covering of 15 ton granite

whis

in changing sir views about the requiren

He began by wishing

recommend

a breakwate

brea

of the Blombe type

Ph

very expensive struct

& when be dir

Come

Kocks

In the final

design the outer slope

is covered with

concrete blocks.

The

barn with 5 ton boulders

In haste.

you faithfully

J. F. Boutton.

V. Fiddes Exp2, CB. Conf.

Share This Page