This matter fully investigated with a view to ascertaining whether shelter could be provided.

It is right in suggesting negotiations that pipes should be procured orally or otherwise obtained.

It was ordered that the C.A. should be approached under austerity measures in detail.

Heretofore used for public service, it should be for individual agents.

Reference: previous Paper.

HONG KONG

No. 12314

(Subject.)

256

DOMESTIC.

C. O.

12314

BIC: REGE 6 APR 07

Canton Kowloon Railway

Replies to complaint of Engineer as to progress made with construction of — & forwards report from Construction Engineers:

(Minutes.)

766

Mr. Lucas

See with this

Eov 10630

4 11000

Page 256

--13363--36000-11-0

Subsequent Paper

100

4258

It was felt that the tunnel could not now be advantageously built by Contract due to the expense already incurred in accumulating plant &c.

Now the C.E. has withdrawn his suggestion for the same reason.

(1100-8)

That weighed with Sir M. Nathan's attitude towards the Railway complication has been a great disappointment.

Share This Page