156

10% D0% 10 set: 972 98ent 19th

vol 3 age erið mi

{

SV

v Tanoq tor alvoo bus amera 108 evit hrs

I wo?,'OA

e volo0 a nit goma, o jowolfa ya on siit rot ilmd geod

final at na dali na

DIS VINORær: tot astar eredw aids

Lew steriidae yew damhane, «'ngimƐ 0!

bertebro aaw sila Tuq ets

as 1 H l trods of des

.RoofvoX 10t moltsfamosos qnible davone VIts a wolfs ton bin

Chor pidow нellm - to son. Us efT

9. U

abort ad good bin doora spillut end

Col??and not sett enti

abooĦ risk vinnu ətamizne J QUIXAT

all to dann wir cebvient 000,546 1T

9. DIUT IIopt a to jelo 6X4 LILY #5

ogist broved smiádao nhã old bña novi ta ist reswted tasoo

betah 28 .OK za:JAI 1310180 ga to TS Mierzetaq xi bexol. re

borliget Janos and on or inarmails et .VORI AUNET .1866

to dmuo. MLİSİZ e.¿ sva 0. as on dro tinistaa Luteino wer

o banorxo una cilj mi aw¤ To drvo. mister mit H‡łw Iernut

s.ft yo habloob I duo pial 6 a foul greft Imavec rafta .enoorges

.fsato 1090 Bom eit ca eno tronave

hral

revin amind at baAI пword JROPGTISYoð

brs to Jaon ed. al ojevicas and mi woda Juuone and bis eerty

.arisuwo stevity sont tiqvod

The balance $40,000 represents the cost of the land required for the rest of the line.

The smallness for this amount is due to the fact that very little of the Earthwork Bank is taken from Borrow pits, nearly all being taken from the cuttings or from Crown Land on the hill sides. A great deal of the land already bought and charged against the Railway will be handed back after the completion of Construction.

Earthwork.

The expenditure under Banks and cuttings includes the cost of Service Roads which are heavy. The estimated amount of $23,848 allows for the metre gauge line bank and temporary bridges between the South Tunnel Face and Tai Kok Taul Store Yard. Also the cart road between Lok Lo-ha and the North Face of the Tunnel.

The expenditure under Earthwork on the line is very heavy due to the hilly nature of the country passed through necessitating very high banks and deep cuttings.

As in most of the cuttings it is necessary to have a good deal of blasting, I have taken out all cuttings for double line, and wherever the material excavated is in excess of the single line Bank, I have made the Bank for double line also.

at volvox glaren ameji vyas: & eTA STOUT

no duron a ot het toď RIM .000, Vi To? Sar o jo bat I

meth are o eth yswllef adj v to two new moltsoimme roo

.absoЯ amionnað bra æreoV ead to

an onid ONT

To stanica: rit af 000, Iệ ant ban toqoɑ sitted bna sevof

.mp F ༣, azzo off to totooria sidetronоH

2 000,32% o

.CH JAISTAI

Cane mbet

ST

.97i8 10NJOKA

200 001.? balio noewtod ɓnal emos esw bisų

dt og od bør fav 107 moldeanogmoO

The Reclamation from the sea of a site for Kowloon Station Yard with the necessary sea wall accounts for $700,000.

There is also a rather heavy item for drainage work in the Reclamation for the Station Yard. A large intercepting sewer as well as a storm water drain has to be built along Des Voeux Road. The sewer has its outfall near Blackhead's Point and the storm water drain is carried in a 10 feet culvert under the Station Yard opposite Granville Road.

There is also a heavy retaining wall in cutting No. 4 to avoid the long slopes necessitated by an open cutting. The cost of a tunnel at this point was found to be