Kowloon Canton Railway.
137
Main Head
Plant
BRITISH SECTION
ESTIMATE.
Sub. Head theinouring.
Work
Beacon Hill Tunnel
Plant.
DESCRIPTION. Rate. Unit. Quantity. AMOUNT. $ Cts. Drilling Plants. 30000/- each 2 80,000 00 10000/- 2 20,000 00 Bluetric Plant. 3000/- 4 12,000 00 Erection. 1000/- 1 4,000 00 1000/- 2 2,000 00 Breetion. 500/- 2 1,000 00 Air Listing plant with pipes. 5000/- 2 10,000 00 Erection. 1000/- 2 2,000 00 Shaft Hoists. 1800/- 2 2,000 00 (corrected to) 1,000 (replaced with proper amount if available) Cranes etc. 6,000 6,000 00 Toco*. 3000/- 10,000 00 Raile &c. 30,000 00 ALONS. 250/+ 20 5,000 00 Motor Magnet, 1 16,000 00 Passenger Ropeway, 1 14,000 00 Total 214,500 00 Contingincies 10% 21,450 00 Grand Total 235,950 00 Deduct depreciation written off against Tunnel 93,000 00 Blanco in hung «t und of work. 1,000 00 1,500 00 (replaced with proper amount if available) 121,500 00231