M C.R.E. No. M.
Kowloon Canton Railway.
ECON
BRITISH SECTION.
ESTIMATE.
114
Main Head.
Sub. Head.
Bridges,
Minor Bridge No.39.
32.
Work
One 5 ft Arch at ch.89*600
Drawing C.R.E. No.269"
AMOUNT.
Quantity. DESCRIPTION. Rate. Unit. Cts. 9,300 Excavation in foundations. 35/- 1,435.00 4,100 Timbering and pumping. 40/- % 2/- 0.ft 1,380.00 3,450 Concrete in foundations. 1,920.00 Masonry in superstructure. 10/- #60 Masonry in Arches. 240.00 130 Masonry in coping. 11 30 8 8 8 8 8 8 8 9 1,130 Dry stone backing. 10 93.00 300 Total 5,379.00 Contingencies 10% 537.93 Grand Total 5,917.23