OCR E. No. 24.

Kowloon Canton Railway.

113

BRITISH SECTION.

ESTIMATE.

Main Head.

Sub. Head

Work

Bridges.

Minor Bridge No.16.

One 10 ft. Arch at chain 38*345

Drawing 0.R.E. No.327B2.

Quantity. DESCRIPTION. Rate. $ Cts. 000 Excavation in foundations 10/- 19,800 00 031 Timbering and pumping 8.900' Concrete in foundations 35/ 001, 00 7,700 Masonry in superstructure. 40/ $1.0 43 32.0 AR 030. 720 Masonry in Arches. 2.00 190 Masonry in coping 2,600 Dry stone backing 2/- 0.ft 00 2/- 0.ft 00 20/ Total 8,736 00 Contingencies 10% 873 60 Grand Total 9,609 60

Page 113

Share This Page