FORM C.R.E. No. 24.

Kowloon Canton Railway.

BRITISH SECTION.

ESTIMATE.

Bridges.

Minor Bridge.

Description Quantity Unit Rate Amount Excavation in Foundations 7,300 cu. ft. 10/- per % oft 73.00 Timbering and pumping 500.00 Concrete in foundations 700 8/- 5,600.00 Masonry in Superstructure 8,300 Masonry in Arches 980 35/- 1,295.00 Masonry in Coping 130 40/- 2,120.00 Dry Stone backing 1,960 2/- 260.00 1,900.00 Total 6,227.00 Contingencies 10% 622.70 Grand Total 6,849.70

Work: One 5 ft. Arch at oh,80*300

Drawing C.R.E. No.26882.

Share This Page