C.R.E. No. 24.

Kowloon Canton Railway.

101 BRITISH SECTION ESTIMATE.

Main Head Bridges.

Sub. Head Minor No.14.

Work One 15 Arch.

C.R.E. No.104 .B2.

DESCRIPTION Quantity Unit Rate AMOUNT Excavation in founds. £3000 $9650 Concrete in founds. $400 5050 Masonry in Footings. 1350 Superstructure. Arches. 140/- 3370 50 Coping. 10/- 1360 00 Dry Stone Backing. 2/c.ft. 40/- 2020 00 2/c.ft. 2200 00 10/ 700 00 * X K 230 00. 475 00 Total 10355 50 Contingencies 10% 1033 55 Grand Total $11391 03

1201 esiniyatino2 istof ban:)

Share This Page