Kowloon Canton Railway.
BRITISH SECTION.
ESTIMATE.
Bridges.
Bridge No.4A.
B1.
Work One 10a Arch between Abuts of Bridge No.4 Drawing C.R.E.No.126
Main Head Sub. Head Pro W Quantity DESCRIPTION Rate Unit AMOUNT 44,000 Excavation in founds. 10/ 440.00 Timbering and pumping. 500.00 2,880 Concrete in founds. 35/- 1,008.00 7,000 Masonry in Festings. 40/- % 2,800.00 4,300 Masonry in Arches. 2/- c.ft. 8,600.00 Total 13,348.00 Contingencies 10% 1,334.80 Grand Total 14,682.80RM C.R F. No. 24.
is likely a file reference and should be kept as is, assuming it was part of the original document header or footer, though not directly related to the table content. However, the initial parts of the text seem unrelated to the table and might be a result of OCR errors or misinterpretation. The main task was to correct and format the table properly.