C.R.E. No. 24.

Kowloon Canton Railway.

BRITISH SECTION.

ESTIMATE.

I.

Main Head....................

Sub. Head....................

Work....................

Bridges

Major Bridge No.30

Four 30' Arches at Chain 71*600

Drawing C.R.E.No.34282.


Quantity DESCRIPTION Unit Rate AMOUNT 101,600 Excavation in founds. Cts. 10% 1,016 Timbering and Pumping. 9,770 6,000 Concrete in founds, 35/% 6,919 40,650 Masonry in superstructure, 12/450 Masonry in Arches. 550 Masonry in Coping. 4,600 Dry Stone backing. 40/- 16,260 2/ 24,900 1,100 10/ 1,100 Total 56,241.50 Contingencies 10% 5,624.15 Grand Total 61,865.65

Page 30

Share This Page