FORM C.R.E. No. 24, Kowloon Canton Railway. BRITISH SECTION. ESTIMATE.

Main Head .... Bridges,

Sub. Head Work Major Bridge No.17. Three 20' Arches at chain 40°.730

Drawing C.R.E.No. 362

DESCRIPTION Quantity Rate Unit AMOUNT Excavation in founds. 21,900 10-% ort 219.00 Timbering and pumping 1,100 Concrete in founds 1,000 8 35/- fort 4,900 Masonry in coping 350 Masonry in superstructure 18,600 40/- % oft 7,440.00 Masonry in arches. 2/m 0.ft. 2,485 9,800.00 Dry stone backing. 700 2/- 0.1t. 3,550 10/- % oft Total 21,679 Contingincies 10% 2,167.95 Grand Total 23,847.45

Page 89

KI letoT

201 zsionigniino)

leloT bræD

Share This Page