on C.R.E. No. 24.

Kowloon Canton Railway.

BRITISH SECTION

ESTIMATE.

Main Head Bridges.

Sub. Head Major No.46.

DESCRIPTION Quantity Unit Rate Cts. $ C Work Twe 201 Spans d. at Chain 105;1. Drawing C.R.E. No.12531. Excavation in founds. Timbering and Pumping. 6650 10/- 300 00 Concrete in founds. 30000 2500 750 00 Masonry in Footings. 230750 35/- % VINORS” 3000 10000 Suprestructure. Coping and Red stones. 140/- % 1200 00 4000 40/- 1800 Dry Stone Pitching. behind abuts. 380 2/ 10/- 00 10/- 180 00 3 50 2 201 Girder Spans landed in Kowloon 500/- each 1000 00 2 100 * Carriage to site and erection. 100/- 200 00 Total 9841 00 Contingencies 10% 984 10 Grand Total $10825 10

Page 90