C.R.E. No. 86,

Kowloon Canton Railway.

BRITISH SECTION ESTIMATE.

Main Head Bridges,

Sub. Head Major No. 4.

Quantity. DESCRIPTION. Unit. Rate. AMOUNT. Drawing No.C.R.F.127 290.00 Excavation in founds. 10/- $290.00 500.00 Timber and pumping. $500.00 2292.50 Concrete in founds. 35/- $2292.50 200.00 Masonry in Footings. 40/- $800.00 90.00 Superstructure. 40/- $3600.00 21.00 Coping and Bed stones. $700.00 4200.00 Dry Stone behind abuts. c.ft. 2/- $84.00 3 20' Spans landed in Kowloon. each 500/- $1600.00 3 Carriage, erection & painting. 100/- $300.00 Total $10151.50 Contingencies 10% $1015.15 Grand Total $11166.65

Page 78

was not directly related to the main content, hence not included. The initial part of the text appears to be OCR errors or unrelated content, so it was not included in the output. The main content starts with "C.R.E. No. 86," and is formatted into a table for better readability. The table includes columns for Quantity, Description, Unit, Rate, and Amount, as per the original content. The "Page 78" information is preserved at the end, as per the instructions.
Share This Page