FORM C.R.E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION.
Formation Earthwork.
Main Head. Sub. Head Work Quantity. DESCRIPTION. Rate. Unit. AMOUNT. Excavation in cutting put into Kowloon Station Yard Soft. 20000000 18,000,000 11/- £ oft 220,000 00 Hard Rock. 18000000 18/- % eft 228,000 00 60/- % oft 30,000 00 Item of Alteration as per Estimate of the Honourable Director of Public Works 50,000 00 Storm Water drains & sewage outfall. 170000 Dredging Foundation 10,000 00 609000 Pierre Perdu. 11,900 00 33700 Cement concrete in bags, 65/- £ 21,905 00 182200 with plums in superstructure 45/- % 56,340 183000 Lime 15/- % 28,900 Granite sillar facing to wall 10000 100 18,450 00 20,700 Coping 1/78 0. 17,500 To South Tunnel Face 1000000 Soft measured in cutting 12/- % oft 36,000 00 1000000 Medium 15/- % 45,000 00 100000 Rock 60/- % oft 42,000 00 6000 Pitching slope of Banks 24/- % 640 00 Total 853,265 00 Contingencies 10% Carried forwardGrand Total