596

KOWLOON-CANTON RAILWAY.

25111

IREC

REGE 15 JUL 07

British Section.

Revised Estimate of Line not including Workshops, Kowloon Station Building, Private Sidings or Deep Sea Wall.

Main Head. Sub Head. Estimate. Survey $45,000.00 Land 139,700.00 Formation A. Earthwork 2,342,204.00 F. Tunnels 3,208,415.00 C. Roads 88,500.00 Bridges A. Major 538,500.43 B. Minor 473,388.11 C. Culverts 88,882.00 V. Fencing A. Boundaries 31,818.00 B. Signs 398.00 VI. Telegraph 28,964.00 VII. Track A. Ballast 747,032.00 B. Permanent Way 154,110.00 223,398.25 39,580.00 2,410.00 VIII. Stations and Buildings A. Buildings and Fixtures 234,037.00 B. Station Machinery C. Furniture D. Workshops IX. Plant A. Construction B. Loco tools and Plant C. Carriage and Wagon D. Engineering X. Loco Rolling Stock F. C. & W. Rolling Stock I. General Charges A. Engineering i 388,148.20 ii 38,970.80 iii 10,956.00 iv 18,089.00 v 20,020.00 vi 128,200.00 7,947,590.79

Eyes

(51.) Chief Resident Engineer.

Share This Page