The Railway though consisting of 2 Sections

should be maintained and worked as a single continuous

Railway so that trains would run and traffic be carried

continuously throughout the whole line without break or

charge.

3

There should be connection at Canton

between the Canton-Kowloon Railway and the Canton-Hankow

Railway so that trains should run and traffic should be

carried from one line to the other without break or charge.

4.

When the Railway approaches completion a

joint Board of Management should be formed composed of 4

Members (two appointed by each Government) and a General

Manager to be selected by agreement between the two Govern-

ments. This Board shall have control of the working of the

Railway.

5.

In deciding how the net profits earned on

the whole railway should be divided between the two

Governments the capital expenditure per mile on construc-

tion should be taken into consideration.

6.

Only one set of workshops will be required

for the whole line and they would be best situated at

Kowloon