73

majaya signia s xtasi vant bus nem govor sa cholod and ot

Ji galingoo to sonado a duoɗttw minow juo gadyriso to

ki ariedt Xoid? yll■*ðan varð bræ „modaya Tedto vna die tw

•ynkwomi nitrow modaya tino bna são ent

ni .amejaya yram tabnu bedrow evať Žíszym I

.80

(anko ni siɗalkava dasid of talteta ai muoďal storiw atbal

of metaya Talimis a robar tuo belT780 878 SÍdnow oliɗug Lia

ent gnikretarit twdon bna gnidrow ma I dołdw rebnu #adS

need esti mejaya sñt soitto JibuÀ egral a tot yttanasan

.Iastmonoos bawat

-İsfignarik ant bitud of antd) of emso I neri.

.ef

7sIlmia ajostinoo #graí gokiteľ bol1d I ‚Y@wilaя zriinake

olidut to rotoaria eldstvonok arið yď betaengve emoɗd ot

bra Nguons dotup gated ton of galwo beltet saedt Jud

asw oń Litau rodoærindo a tuo gaimirý to villidiaeoqui edt

Josinoo adź nerw redtøm on at midt .enit briɗíeď vllautos

-non ed3 Jnaem ji nedv tud,wevod a goibitud rot vino at

naw ti miano a ot Enti eno daaqa of oa to noitsiqmooms

ignorance of the nature of work to be done. I do not know

whether he still holds the same opinion now that he has

seen the tunnel. You can take my word for it that no day

work is employed where it is possible to do the work by

petty contract. The labour employed in the tunnel is daily

labour as well as one or two gangs outside for doing odd

jobs. Some Carpenters and Blacksmiths are also on day work.

There is a certain amount of day work on the Brickfields.

Sone

Everything else is dões by petty contract.

21.

In order to show how impossible and un-

-economical the Public Works Department system would be

for quick Railway Construction I will give an instance

which came under my notice lately. The Honourable Director

of Public Works undertook to lay in a pipe from the catch

water drain to the tunnel works on the North Side of the

hills. In due time I got the bill to pay and noticed an

item in it for the transport of the pipes to the site at

one cent per pound, or $22.40 per ton. I wrote asking if

.Jnerettib setup

this was correct and the standard price as I could get the

.08

**To otidut to todosnt! siderwonok aft

estel ent of troqer ein to cyaq esl adð ni moitnetts awarb

arijna aid awoda vino atɗi „beyoique Xrow yab to dnUOZUS

Sonetongi

work done for $6.50 per ton.

22.

I received back an answer that as the work

was urgent it was not possible to call for tenders in the

ordinary way. Thus it was not thought worth while or

possible