Kowloon-Canton hallway terminus.

Proposed recimation for Fassenger Station and Goods Depôt.

Complete Scheme.

estimate.

Earth Filling.

..C.Y.7,053,743 &

Add 10% for contingencies.

.35 = $2,479,810

247,981

18,727,841

Pierre Perlu.........C.Y. 389,000 € Dredging berths (less

$1.80

$488,600

value as filling) Uredging trenches for foundations (less value as filling) do. ão. deeper than 40 feet.... Quay wall (pubi13

quay).....

0.Y. 511,000 @

.40%

204,400

.C.Y.

....L..

do. ( feet of water)..

do. (15 do.

}L..

do. (94

jo.

L..

do. (30

jo.

JL..

jo. (40

30.

JL..

C.Y. 445,500 @

$9,000 €

450 @ $113.00 885 @ $184.00 505 @ $307,00 1,090 @ #405.00 4,560 @ $509.00 1,710 @ 1710.00

.403

178,200

$2.65

230,550

=

50元550

=

119,840

247.195

-

441,450

2,316,950

=

1,214,100

9,290*

5,461,775

Add 25% contingencies.

.1,885,444

8,887,219

Drainage (estimate based on

area of jani reclaimed)

Add 25% for contingencies.

3.r. 6,820,636 @ 2k 7 =155,518

38,579

194,895

9,746,855

Deduct for spoil from Railway Cutting to be used as filling, 854 plus 10% for contin- -gencies as above:- 0.Y. 449,500.

173.05

9,575,76

Say.

$9,573,000

*Includes 50 feet for return of wail to join

wall of K.M.L.81.

id. W. Chatham

D.pw .

27.12.05