}

і

591

Kowloon Canton Railway Surgery British Per? Engineer Report

Conclusion

beyond that which Your Excellway

already possCODED

Finally what I have said as to the comparative merits of Railways Nod 1 and 2 ( for surely soute (a) is drad ) may thus be summarised and written.

Cost of Construction. RY1 = RG2 + B 293 650 Working expenses (incl Juan") R4 /= RM2 +81,716,084 Time =

arquised for construction R41 = R92 =

R92 = 2p Gear)

Anticipatul Raffie per annum B$76,250.

I have the honour to be des

Your aberant servant-

Je Bruce BA.B2.

Chief Surveying Engineer.

Kowloon Canton RY Bortion Pretion

(18)

'',,

Share This Page