16.
on
51
M2
attach small sections of the Sam Cooper's N2 4 site (tracing A) the position of which is clearly shown upon the general plan of the works now forwarded. The natural Trainage area amounts to 470 acres, of which 210 adres lie above the Zytam West catch- -water supplying Tytam Reservoir. The drainage of a large area situated entirely outside the present bytam Dramage Area can be intercepted by catchwaters constructed along the southern slopes of the hills beyond the head of the valley.
Having giver you a full account of what has been done, I will now deal specifically with the point's raised in your letter under reply.
14. Jumping Station. You will observe that
The plan now submitted, I have altered the position of the Pumping Station and the question of arrangement of the buildings therefore requires be considered in relation to the new site. The reasons for making this alteration are referred I may and they letter to Government and the small bay situated be- -tween the site originally proposed and that now selected will in all probability be filled in and reclaimed with the material excavated from the site
the low-level dom, thus form
to
that!
of -ing a useful area of flat ground in proximity
to the station and doubtless producing
an
improvement in the sanitary moition of the
6.
Jistrict