i
kurovsten
(1) The construction of a large lam below Tytan Tuk Village with the 45
necessary road diversions.
(2) An extension of the Pumping Station buildings.
(3) The provision of additional pumping plant.
orien petala odd to dium i
prata meni deer ally nig, nuela add val of roodora ↑ „M
Men Jqut nol 18os odd tu drundeves al netofvoga vdes od fe
tila mwała mdd to rade odd to kelias
་
1 g da nika odd
Ja at dd no1 Juriai -$$ muda kollet al of F<3d Fadne od sve
seala dont text ed code
.000.0
รา
43 ande aber solat sdd saidenilout me? #loeltova ed 11ts
FUND ARK
A3 10 Jan 31
it
devidor me el pelucllot e47.21
Yandio ed Flood. 92. JUTE
„ustoffen noi!!! At Luucqni od med (1)
acids35 Kalpar le colloendanco (9)
ve Inedt Male achitoni mon】 1808 wa¶ (8) .....(efìa 09.1 dita-1) nicv9586f dura y ejy?
A Plans Dns poijsdë saiqact of elso.9 BeeCSA (4)
niem najdete vrsnogled not downd (as
+
Cu noilet weland is? delt "at niso prizi (A)
............................(evilm 20.2 djsosi) nie46 esvet æsjyT
tæœu vi tosuere due od od madosti *i giam poitou? (0) (-11, 13.5 daan:1) nies splein Snijmotiqui 201
cad), Penobio sends e-nidoar kriget? (9)
aui!!ie i polevitat 10 Idenso does soniyne noldoens pallude! (est ma soolley
•tse colon-trilenk
(4) Taking up the 18" suction main and relaying same as a rising main, including the necessary length of piping to complete same.
(5) The construction of catchwaters to such extent as may be found alvisabl
in order to render available the water from areas situated outside the
natural drainage area,
18. As may be gathered none of the works which I now propose to undertake will be rendered abortive by those to be undertaken later, with the except- ion of the suction main, and as the pipes from it will be used for the add- itional rising main requirel, practically only the labour in laying them and taking them up again will be sacrificed,
19. If the works enumerated under paragraph 15 be undertaken at once, they should be completel in readiness for the dry season 1905-3 and it is even possible that some benefit may be derived from them during next dry season. I 30. I therefore request authority to obtain tenders for the works enumer- ated from contractors whom I consider qualified to carry them out in a satisfactory and expeditious manner.
21. On receiving the authority of His Excellency the Governor for the abov above, I will prepare a statement for transmission to Mr Chadwick giving
a full account of what has been lone up to the present time and of the works decided upon.
(Sa.)
I have ic..
W.Chatham.
Director of Public Works.
.000.780.
Jedes NOT undyi enidne odd eds-fqueo aj letivos La
The 90 11* ineueta is Japijas as Jiadue of eld
2