44

gvoda

It coisa mc vid to nado 917 (0)

* LI'. hat he unftrandende ela va rendelovo od 3

goten einde nel ditanno JE 1873 od volored) Iliw bne Tails

Ila wd of neclo pris? (3)

icleurd vida in vnoo ed aro disconc Autodalidadas ybannis Jnriq

#idj not) vivans eli lo noduliou 10 *** 13 rtova od 26 oz 79jjel enj

-3

J

.997UCE

Pie Pomaknat ena malam od oved I dobd of exnow sninismer enT .CI

VT 13 tlacievet no】 enados ajelunco add to tur gaivтico ed of

traso yeal „gelo - pten9 110pne odd no node are toe veilsV

test mit 1893 noidsde enfaru) 94) 101 stie a lo noija:10) adi (e)

dt028 od char Ilod ynwcBogra si to neijoers add the ves

.fanetto vtsenis

Fimo oda 1 seg gemal odd saitendrco (801 #28 « to robjorntenco ed (a)

sonanted synge Jent (A ed et 1o noijsvale ne js

79670

JORIQ

„sicvongan dzewny” wer end neon beoy salisive odd niol ed

I wel priamo llers edd not? nier achtove e lc joc trivel anT (0)

1 mol wise-tnici e to Ine acidede soignol and of fejquijanos

Jeprul meal aid nd voorajne edd de nized eburt odd

Jn.. "ubianco I „anijejů pejasoa and od Melon daiN .II

Bend ved and mwch newcl Jedesnoe Ji defidejas od side

- note fost pidd of isi eved dolde sjndég s¿T .ts

atiremban end the die lonelis 1j je sidalisve mojew

(*) podrykove od od leine deu egida coefa yng 10 94[5

[Thrillhd satisficoqet ed vem pet enjol

you add sjeforrcgor nj swoiv e'xoinfort av djiw

vol dxa soudu? sied 16 Jints oj se on I as

„Lanfuns zt

od is visenim snil edð no leicondraco co 1la tech eft .SI

ið meta od pach waived5 -63 AND

: ° ཞཊྚ 10.*

Msgenes isi-09

Pe fuogut. Te Jalog & mcq) Nointedo

Y Felta 11!* JT .msjv! Je #RO

kia mcl fornt ® Bella of asi eynel

urfussao to yaffider ivte ad? „81

sivas or for dessa de JounJenco

but the valley conveying the overflow from the byewash Reservoir is so unfavourable in its configuration for the diversion that practically no

saving could be effected in the road itself whilst an increase in the

length of the rising mains, which will be laid in the road, would be entail-

ed.

14. I propose to lay the rising main with cast iron pipes, 18 inches in

diameter, and to make provision in constructing the road for duplicating

the main at a future date. The question of the size of the pipes will how-

ever be submitted to Mr. Chadwick when the indent for them is Jent forward,

15. Bor the suction main, I propose also to use 18 inch pipes, which

will be available for duplicating the rising main when the large reservoir

has been constructed and the suction main from the upper dam is no longer

requirel.

13. The following is an estimate of the cost of the works which I now

propose should be undertaken, including the pumping plant already ordered:-

(1) Dam to impound 194 million gallons....

(2) Construction of Pumping Station, including

formation of site......

....

(3) New Road from junction with Stanley Road to near

Tytan Byewash Reservoir (length 1.40 miles)...

(4) Access roads to Pumping Station and Gauge Basin

and track for temporary suction main....

(5) Rising main 18" diameter, from Pumping Station to

Tytan Gauge Basin (length 3.03 miles)..

(6) Suction main 18" diameter to be subsequently used

for duplicating rising main (length 1.25 miles) (7) Pumping machinery already ordered, (two sets of

engines each capable of delivering million

gallons per day) including erection

$290,000.

50,000.

98,000.

20,000.

98,000.

60,000.

108,000,

724,000.

Contingencies say......................

Total.......

53,000.

$780,000.

17. The works required to complete the entire Tytan Tuk Scheme, for which

it is not possible to submit an estimate at present, will be as follows:-

(1).