whole of

the line between the one to

auantemecu the Co voluntan

the 4th of December undertook to concute)

am

tivo tracks Stones them that

was

#oat

ly whi

the middle ship in consider

last messis Ligh

of being allowed to substitut

Orange

on

behalf of

a double hack centre port System for a double trai.

Comhome deposited side fora szolim

the beau

A

cross section

showing

double line

a

with centre potes and

a

space of 6ft

It 6 in

between the tracks, coured with couch to 6 in indepth a concrite bed bring

laid undercath

Each live of

Tramway

Extending 18 in outside

the rails

on sitter

side wherever the

Tramway

is laid

other

than

natural

ground 12

Construction was

ведит

o

472

the luies

of this cross section

which

was accepted

other remon icony

by the Gort parity

on

account of the

Company voluntarily

is stated,

undertaking, to

concrete

the whole of

the 6 ft 6 in between

the hacks. The

AA of PALKAL

Until this section was submitted it was inteword that the poles should be at the kerb

the tracks 4 feet apart, this 4 feet

being concated Miron and

maintained in good repair by the Company

Share This Page