450

rite'beefan: Justized

er

eidenuonos eT

!× !

istnoto0

elu moil nortentul Rovincar evød i les oild s

ཀ།

ung wild ex deld vasqnoƆ bas aoenixor! .ogerså‚ensura! satszusão?

Mata osi11) Terangú eft mort doits.Inon so s to di9ser at 93 big.

mat badjob 9. ud in [tonijenoo (e# ja vormed to ejd mid of sonetelor

Thu 284 dvidboup atid 21866 598 Jog 2h

TU HOUSNODE.

to get nuidomtumo git duoidis baidies yumrl med „Josenna

moigijo to enenellib on enede atuor add to anoidnog niajuso nɔ be

,408nd eid Jioqque of vi6229091 DJ91onos to Jaudun sid of er w9jalz:

Tak, basu gaid ereilt nõidounjenoo lo qu ell

prods Alo 90% (noscelertez yew preve ni gated ng byartoo97 aw dori-

.woled dojaNe add no awed at any

ad entot 21 si 2i187 sij gelou evenonoo eff

* amol zuil .doqeb at asdoner odenonco esetque sit the epicur

.ɣ¶ubesseniu si maltul garddyne bas tew Jucasino; Justoits vidquonoli

eller renat add agedw,eau duob to sexo elt al

2b19jxe ad-10130 sostrue to zelovi 9 sit tasje J991 ↑ neús 97on don 59-

woied uwala as 1187 dosa sui du 4 Com 31 Mar 10 og list 001

I

91: Skomu elu mode Aviju unjust juta 9.1.

* of Onedxe gino blow 9J810000 sosiue but Japa Jeel wir

I J

outside each track as set forth in clause 14 of the Tranway Crdinance, and shewn on the following sketch.

418-7

CONCRETE

418->

418-3

MACADAM VZ Confersted. I

In the work executed up to the present we have

laid a concrete surface the full width between the double line with centre poies, but this was owing to a misunderstood cablegram, and now on receipt by mail of the corrected message I have instructed the contractors to suspend laying in this surface concrete until the question is settled except where the excavation for same is already opened.

If the foregoing type of construction is approved by the Director of Public Works for the whole system, I am prepared to lay surface concrete 3 inches in thickness between the 18 inch margins of the double line centre pole construction as shewn below,

"I inches tick

REFE

but this is only on the understanding that the Tramway Company does not have to maintain this.

Unless this type of construction is approved I am instructed to adhere strictly to clause 14 of the Ordinance and not extend the surface concrete beyond the 18 inch margins in the case of the double line centre pole construction referred to above.

Up to the present the constructional work has progressed fairly well as a commencerent, and I am in hopes of stili more rapid progress when this question is settled, but at the present stage of the work any delay in arriving at an understanding will complete -ly disorganise our staff and matters will be at a deadlock, I therefore

presume to ask you as a special favour, and in the interests of the Colony in general, to thoroughly consider the fairness of these re- quests and to rest assured that it would be fatal policy on the part of the Tramway Company to persist in pushing forward a type of construction

Would which in any way cause trouble or expense to either the Colony or ther-