.:

LOPA SÆDATOTE

11

{ ད

39

#

CA

... ...

A B 10 ne c'06

ALMA Votu 20

M KINO BO

TO LOV

03

7.

Experiments to be made as to voids in broken stone and as to porosity of concrete when made, and the proportions of ingredients of concrete of dam to be altered if necessary, in accordance with such experiments,

8.

Each filter to have a Venturi meter. A Venturi meter to be fixed on supply main near Service Reservoir,

9.

The question of relative cheapness of iron pillars and joists,versus brick pillars and arches, for roof of Service Reservoir to be considered.

10.

Gauge for measuring height of water in reservoir to be either float gauge in valve well, or a series of glass gauges up back slope.

11.

Kowloon city service-reservoir to be at Su ch

a level that it will be on hydraulic gradient when a main

is laid on proposed road along old boundary line.

L.G. 25. 4. 2.

bebest. Chadwick.

to yfuboluy

10201 .i. £:15

* tugurd

NT

B

a o bes LED 60

•FTER HL180

હું

an alumets via havies Pel tuo tro mne Level 94%

1

£10

Share This Page